Share Development Application No. PL2018-081 on FacebookShare Development Application No. PL2018-081 on TwitterShare Development Application No. PL2018-081 on LinkedinEmail Development Application No. PL2018-081 link
1343 and 1331 Alberni Highway and 1330 Valley Road
The Regional District of Nanaimo has received an application from Toby Seward on behalf of Pine Tree Centre Holdings Corporation to rezone the subject property to decrease the minimum parcel size and to increase the maximum permitted parcel coverage for buildings and structures. The proposal is to amend the minimum parcel size from 1.0 hectares to 0.8 hectares to facilitate the subdivision of the subject property into two lots. The proposal will increase the maximum parcel coverage for buildings and structures from 30 per cent on the first hectare and 5 per cent on the remainder of the parcel to 40 per cent on the entire parcel. The property will be connected to the EPCOR community water system prior to the adoption of the zoning amendment.
The subject property (the Pine Tree Centre) is legally described as That Part of Lot 13, District Lot 156, Nanoose District, Plan 1964, Lying to the West Part of a Boundary Parallel to and Perpendicularly Distant 311 Feet from the Westerly Boundary of Said Lot, Except Part in Plan 733 RW and is 1.95 hectares. The property is currently zoned C-3.1 which permits the uses within the Commercial 3 zone and site-specific use for a vehicle wrecking yard with outdoor storage limited to 400 square metres (see Document Library). The property contains 10 commercial buildings and has been lawfully above the maximum permitted parcel coverage prior to the adoption of zoning in 2002. The zoning amendment will permit the replacement of existing buildings that are currently non-conforming.
This is in your community and we want to hear your thoughts on this proposal. A few ways you can learn more and share your thoughts are by:
Check out our Document Library which includes the site plan and supporting studies
To see the status of the application and next steps visit our Process
Visit the FAQ's or Important Links for more information
Be sure to Register to provide your input
Share your thoughts on the application in the Application Input tab below
Submit your questions and we will provide an answer for all to see in the Ask a Question tab below
Project updates will be shared in the What's New tab as the project moves forward
Connect with our team by email or phone - see our contact info in Who's Listening
1343 and 1331 Alberni Highway and 1330 Valley Road
The Regional District of Nanaimo has received an application from Toby Seward on behalf of Pine Tree Centre Holdings Corporation to rezone the subject property to decrease the minimum parcel size and to increase the maximum permitted parcel coverage for buildings and structures. The proposal is to amend the minimum parcel size from 1.0 hectares to 0.8 hectares to facilitate the subdivision of the subject property into two lots. The proposal will increase the maximum parcel coverage for buildings and structures from 30 per cent on the first hectare and 5 per cent on the remainder of the parcel to 40 per cent on the entire parcel. The property will be connected to the EPCOR community water system prior to the adoption of the zoning amendment.
The subject property (the Pine Tree Centre) is legally described as That Part of Lot 13, District Lot 156, Nanoose District, Plan 1964, Lying to the West Part of a Boundary Parallel to and Perpendicularly Distant 311 Feet from the Westerly Boundary of Said Lot, Except Part in Plan 733 RW and is 1.95 hectares. The property is currently zoned C-3.1 which permits the uses within the Commercial 3 zone and site-specific use for a vehicle wrecking yard with outdoor storage limited to 400 square metres (see Document Library). The property contains 10 commercial buildings and has been lawfully above the maximum permitted parcel coverage prior to the adoption of zoning in 2002. The zoning amendment will permit the replacement of existing buildings that are currently non-conforming.
This is in your community and we want to hear your thoughts on this proposal. A few ways you can learn more and share your thoughts are by:
Check out our Document Library which includes the site plan and supporting studies
To see the status of the application and next steps visit our Process
Visit the FAQ's or Important Links for more information
Be sure to Register to provide your input
Share your thoughts on the application in the Application Input tab below
Submit your questions and we will provide an answer for all to see in the Ask a Question tab below
Project updates will be shared in the What's New tab as the project moves forward
Connect with our team by email or phone - see our contact info in Who's Listening
Development Application No. PL2018-081 has finished this stage
The application has been received and we are inviting public comments and contributions until August 5, 2021
Under Review
Development Application No. PL2018-081 has finished this stage
The project team will analyze the public input and prepare a report to the Electoral Area Services Committee and Regional Board.
Board Consideration - 1st and 2nd Reading
Development Application No. PL2018-081 has finished this stage
The amendment bylaw to be considered for 1st and 2nd reading.
Public Hearing
Development Application No. PL2018-081 has finished this stage
If the amendment bylaw receives 1st and 2nd reading, a public hearing may be scheduled. Note, in response to the COVID-19 pandemic requirements for physical distancing, a public hearing can be held, however it must be entirely electronic.
Board Consideration - 3rd Reading
Development Application No. PL2018-081 has finished this stage
Following the public hearing, the next step in the bylaw adoption process is the consideration of 3rd reading.
Ministry of Transportation and Infrastructure Approval of the Bylaw
Development Application No. PL2018-081 has finished this stage
Prior to bylaw adoption, the Ministry of Transportation and Infrastructure must approve the bylaw as the amendment is within 800 metres of an intersection on a controlled access highway.
Completion of Conditions of Approval
Development Application No. PL2018-081 has finished this stage
At this stage, the applicant must complete all conditions of approval prior to the consideration of the bylaw for adoption.
Adoption of the Bylaw
Development Application No. PL2018-081 is currently at this stage
Once the conditions of approval have been satisfied, the Board may consider the amendment bylaw for adoption.