Electoral Area F Official Community Plan Update
Electoral Area F Official Community Plan Update
The Regional District of Nanaimo (RDN) is updating the Electoral Area F Official Community Plan (OCP). Electoral Area F includes the communities of Coombs, Hilliers, Errington, Meadowood and Whiskey Creek and the surrounding rural areas.
The first Electoral Area F OCP was adopted in 1999, and new Census Canada Data shows that as of 2021, the population has grown over 50% to approximately 8,200 people. Much of the OCP remains relevant today, and this project was initiated in 2019 to address emerging challenges and update sections of the OCP that have become dated.
Draft Electoral Area F Official Community Plan
After completing Round 1 and Round 2 of community engagement, the RDN is pleased to announce the Draft Electoral Area F Official Community Plan (Draft OCP) is ready for community review as part of Round 3 of engagement.
We look forward to hearing from you as we work towards a plan that reflects your vision for the community!
How can I get involved and learn more?
- Subscribe to this page (top right) to receive email notification of news and updates
- Review the Draft OCP and fill out the survey and/or leave general project comments
- Learn about development permit areas and review the proposed draft development permit area exemptions and guidelines
- Review the Community Resources and visit the document library to learn more about the project and related initiatives
- Watch both project videos to learn more about what an OCP is and a summary of the project and engagement to date
- Read the Round 1, Round 2 and the Final Engagement Summary to see what has happened so far
- Share your questions and we will provide an answer
- Contact the project team directly at: areafocp@rdn.bc.ca
Electoral Area F Official Community Plan Update
The Regional District of Nanaimo (RDN) is updating the Electoral Area F Official Community Plan (OCP). Electoral Area F includes the communities of Coombs, Hilliers, Errington, Meadowood and Whiskey Creek and the surrounding rural areas.
The first Electoral Area F OCP was adopted in 1999, and new Census Canada Data shows that as of 2021, the population has grown over 50% to approximately 8,200 people. Much of the OCP remains relevant today, and this project was initiated in 2019 to address emerging challenges and update sections of the OCP that have become dated.
Draft Electoral Area F Official Community Plan
After completing Round 1 and Round 2 of community engagement, the RDN is pleased to announce the Draft Electoral Area F Official Community Plan (Draft OCP) is ready for community review as part of Round 3 of engagement.
We look forward to hearing from you as we work towards a plan that reflects your vision for the community!
How can I get involved and learn more?
- Subscribe to this page (top right) to receive email notification of news and updates
- Review the Draft OCP and fill out the survey and/or leave general project comments
- Learn about development permit areas and review the proposed draft development permit area exemptions and guidelines
- Review the Community Resources and visit the document library to learn more about the project and related initiatives
- Watch both project videos to learn more about what an OCP is and a summary of the project and engagement to date
- Read the Round 1, Round 2 and the Final Engagement Summary to see what has happened so far
- Share your questions and we will provide an answer
- Contact the project team directly at: areafocp@rdn.bc.ca
-
Next Steps in 2025
Share Next Steps in 2025 on Facebook Share Next Steps in 2025 on Twitter Share Next Steps in 2025 on Linkedin Email Next Steps in 2025 linkThank you to everyone who participated in the Electoral Area F OCP review. The project will continue in 2025 with the next step provided in the near future. Please check back in when updates are available or subscribe under 'Stay Informed'.
-
Round 3 of Engagement
Share Round 3 of Engagement on Facebook Share Round 3 of Engagement on Twitter Share Round 3 of Engagement on Linkedin Email Round 3 of Engagement linkThank you to everyone who participated in Round 3 of engagement for the Electoral Area F Official Community Plan (OCP) Update. All community feedback received will be included in the Round 3 Engagement Summary which will be presented to the Regional District of Nanaimo Board and released on the project webpage. All community feedback received throughout the duration of the project will be analyzed and used to help inform and finalize the OCP. Stay tuned for more information and opportunities to get involved in the coming weeks!
-
Round 3 of Engagement Extended!
Share Round 3 of Engagement Extended! on Facebook Share Round 3 of Engagement Extended! on Twitter Share Round 3 of Engagement Extended! on Linkedin Email Round 3 of Engagement Extended! linkBased on feedback received during our community meetings this week, we've extended Round 3 of engagement until October 6, 2023. We hope this provides residents enough time to submit your feedback and have your voice heard!
How can I get involved and learn more?
- Subscribe to this page (top right of the main page) to receive email notification of news and updates
- Review the Draft OCP and fill out the survey and/or leave general project comments
- Learn about development permit areas and review the proposed draft development permit area exemptions and guidelines
- Review the Community Resources and visit the document library to learn more about the project and related initiatives
- Watch both project videos to learn more about what an OCP is and a summary of the project and engagement to date
- Read the Round 1, Round 2 and the Final Engagement Summary to see what has happened so far
- Share your questions and we will provide an answer
- Contact the project team directly at: areafocp@rdn.bc.ca
We look forward to working with the community as we finalize the Draft OCP!
-
Round 3 of Engagement Extended!
Share Round 3 of Engagement Extended! on Facebook Share Round 3 of Engagement Extended! on Twitter Share Round 3 of Engagement Extended! on Linkedin Email Round 3 of Engagement Extended! linkBased on feedback received during our community meetings this week, we've extended Round 3 of engagement until September 29, 2023. We hope this provides residents enough time to submit your feedback and have your voice heard!
How can I get involved and learn more?
- Subscribe to this page (top right of the main page) to receive email notification of news and updates
- Review the Draft OCP and fill out the survey and/or leave general project comments
- Learn about development permit areas and review the proposed draft development permit area exemptions and guidelines
- Review the Community Resources and visit the document library to learn more about the project and related initiatives
- Watch both project videos to learn more about what an OCP is and a summary of the project and engagement to date
- Read the Round 1, Round 2 and the Final Engagement Summary to see what has happened so far
- Share your questions and we will provide an answer
- Contact the project team directly at: areafocp@rdn.bc.ca
We look forward to working with the community as we finalize the Draft OCP!
-
Upcoming Community Meetings Announced!
Share Upcoming Community Meetings Announced! on Facebook Share Upcoming Community Meetings Announced! on Twitter Share Upcoming Community Meetings Announced! on Linkedin Email Upcoming Community Meetings Announced! linkWe are excited to announce the dates, times and locations of our upcoming in-person community meetings! Please join the project team and Electoral Area F Director Leanne Salter at our upcoming community meetings to learn more about the draft OCP and provide your feedback!
Monday, September 11, 2023
Meadowood Community Centre
1830 Galvin Place
Time: 6:00 p.m. to 9:00 p.m.
Thursday, September 14, 2023The Bradley Centre
975 Shearme Road
Time: 6:00 p.m. to 9:00 p.m.
The community meetings are an opportunity for residents to review project materials, ask questions, have one-on-one conversations with the project team and Area Director and submit feedback. The feedback gathered from these meetings and throughout Round 3 of engagement will be used to help refine and finalize the OCP.
We look forward to hearing from you as we work towards a final plan that reflects your vision for the community!
-
Draft Electoral Area F Official Community Plan
Share Draft Electoral Area F Official Community Plan on Facebook Share Draft Electoral Area F Official Community Plan on Twitter Share Draft Electoral Area F Official Community Plan on Linkedin Email Draft Electoral Area F Official Community Plan linkThe Draft Electoral Area F Official Community Plan (Draft OCP) is ready for community review and we are pleased to announce Round 3 of community engagement is now underway. Round 3 involves gathering feedback and discussing the Draft OCP, which reflects Round 2 input, to refine and finalize the content. Electoral Area F residents can provide their feedback and learn how the Draft OCP will guide growth and reflect community values in Area F by:
- reviewing the Draft OCP and completing the survey between June 27 and September 15;
- attending two in-person community meetings in September;
- Joining Leanne Salter, Director, Electoral Area F to discuss the draft OCP and provide your feedback at our project office hours happening every Monday from 10:30 a.m. to 2:30 p.m. until August 28 (except for the August 7 statutory holiday) at the RDN Parks office located at 1490 Springhill Road; or
- visiting the project webpage to review project material and submitting questions and comments.
The September in-person community meetings will provide residents the opportunity to review project materials, ask questions, have one-on-one conversations with Regional District of Nanaimo (RDN) staff and submit feedback. The RDN will share the meeting dates, times and location once confirmed.
We look forward to hearing from the community as we work together to finalize the OCP!
-
Final Engagement Summary and Recommendations
Share Final Engagement Summary and Recommendations on Facebook Share Final Engagement Summary and Recommendations on Twitter Share Final Engagement Summary and Recommendations on Linkedin Email Final Engagement Summary and Recommendations linkThe Final Engagement Summary containing recommendations on how the OCP could be updated is now available for community review. This final report has been developed based on community feedback shared through both rounds of engagement implemented in Phase 2 of the OCP Update.
The Electoral Area F OCP will be updated based on feedback shared by community members through both rounds of engagement in Phase 2: Engage of the OCP Update process, as well as technical studies and best practices. The updated draft OCP will be shared with Area F community members for review and comment in Round 3 of engagement as part of Phase 3: Draft OCP. Phase 4: Adoption will take place once Round 3 of engagement has concluded and the Draft OCP has been updated and finalized. This final phase includes the legislated bylaw adoption process including a public hearing.
Stay tuned for more information on the draft OCP and Round 3 of Engagement coming this fall!
-
Round 2 Engagement Summary
Share Round 2 Engagement Summary on Facebook Share Round 2 Engagement Summary on Twitter Share Round 2 Engagement Summary on Linkedin Email Round 2 Engagement Summary linkThank you to the Area F Community! The Engagement Summary for Round 2 of the Official Community Plan Update project is now available. In February and March of 2022, approximately 193 residents provided feedback and/or attended an event. Since the re-start of the project in February 2022 more than 900 residents and stakeholders visited the project website, reviewed materials, and viewed the project video.The report includes a brief summary of input for a quick read as well as a detailed summary. All raw comments are included in Part 2 of the report. What was heard from the community in Round 2 will be used to guide the Draft OCP. Once the Draft OCP is complete, it will be made available to community members for review and comment as part of the third round of engagement.
Stay tuned for news about the Draft OCP and upcoming engagement for the project. -
Round 2 of Engagement
Share Round 2 of Engagement on Facebook Share Round 2 of Engagement on Twitter Share Round 2 of Engagement on Linkedin Email Round 2 of Engagement linkThank you to everyone who participated in Round 2 of engagement for the Electoral Area F Official Community Plan (OCP) Update. All public input and submissions received by March 31, 2022, will be included in the Round 2 Engagement Summary and the Final Engagement Summary (Rounds 1 and 2) that will be released on the project webpage in the coming weeks. All of the community input received to date will be analyzed and used to help inform and guide policy directions in the Draft OCP. Phase 3 of the project includes the drafting of the OCP and subsequent engagement opportunities for the public to review and comment on the draft. Stay tuned for more information in the coming weeks!
-
Virtual Town Hall Meetings
Share Virtual Town Hall Meetings on Facebook Share Virtual Town Hall Meetings on Twitter Share Virtual Town Hall Meetings on Linkedin Email Virtual Town Hall Meetings linkUpcoming Virtual Town Hall Meetings:
Virtual Town Hall Meetings will be hosted over Zoom, and the access links/phone numbers for each session have been provided below.
For ease of participation, the Virtual Town Halls have been organized by theme areas.
- The Kick-Off Town Hall will be a refresh and review of work completed to date.
- The following 6 Town Halls are organized by OCP Theme Area to focus our conversations. Each Theme Area will have 2 Town Halls.
- Finally, we’ll wrap up this round of engagement with a Final Town Hall to provide an overview of what will happen next.
You’re welcome to attend as many of the Town Halls that you’re interested in. Town Halls will commence at the time indicated below and will not necessarily run the entire designated 2 hours. It is recommended to join the meeting at the identified start time as meetings may come to a natural conclusion and end early if there are no further comments or feedback from community members in attendance.To participate in a Zoom meeting electronically, please click the associated link below and enter the Meeting ID and Passcode. To participate by telephone, please dial the telephone number and enter the Meeting ID for the Town Hall you wish to attend.
If you have any questions about Zoom or how to access the Virtual Town Halls, please email areafocp@rdn.bc.ca, or book an appointment with a member of our project team by calling: 250-390-6761 or toll free: 1-877-607-4111.
Thursday, February 24, 2022
Kick-Off Town Hall
Time: 6:00 to 8:00 pm
Join Zoom Meeting:
https://us02web.zoom.us/j/81838083457?pwd=MjFqVGwrc0crSzhnazJqVUgySDdiZz09
Meeting ID: 818 3808 3457
Passcode: 253762
Join meeting by telephone:
+1 778 907 2071 Canada
Meeting ID: 818 3808 3457
Monday, March 7, 2022
Character Town Hall #2
Time: 6:00 to 8:00 pm
Join Zoom Meeting:
https://us02web.zoom.us/j/87981701621?pwd=c0l4MFVFL3c3NGNlaE9Qb3VJS0FZZz09
Meeting ID: 879 8170 1621
Passcode: 543265
Join meeting by telephone:
+1 778 907 2071 Canada
Meeting ID: 879 8170 1621
Wednesday, March 2, 2022
Growth Town Hall #1
Time: 6:00 to 8:00 pm
Join Zoom Meeting:
https://us02web.zoom.us/j/86421314086?pwd=aXUxeWtpZndIYkkrQzkxellYNldwZz09
Meeting ID: 864 2131 4086
Passcode: 417763
Join meeting by telephone:
+1 778 907 2071 Canada
Meeting ID: 864 2131 4086
Tuesday, March 8, 2022
Resilience Town Hall #1
Time: 6:00 to 8:00 pm
Join Zoom Meeting:
https://us02web.zoom.us/j/82612376641?pwd=bDBsQUVvUm5UdjFYZUNMRVMyTnJ2dz09
Meeting ID: 826 1237 6641
Passcode: 687950
Join meeting by telephone:
+1 778 907 2071 Canada
Meeting ID: 826 1237 6641
Thursday, March 3, 2022
Growth Town Hall #2
Time: 6:00 to 8:00 pm
Join Zoom Meeting:
https://us02web.zoom.us/j/81520074021?pwd=ZkdwNkxUdXBiMDlMdHM4dHlTaXMyUT09
Meeting ID: 815 2007 4021
Passcode: 942489
Join meeting by telephone:
+1 778 907 2071 Canada
Meeting ID: 815 2007 4021
Sunday, March 13, 2022
Resilience Town Hall #2
Time: 1:00 to 3:00 pm
Join Zoom Meeting:
https://us02web.zoom.us/j/86753202307?pwd=SUpKdXF0bFpBZVpSUTRPUDh3Y3QzUT09
Meeting ID: 867 5320 2307
Passcode: 391821
Join meeting by telephone:
+1 778 907 2071 Canada
Meeting ID: 867 5320 2307
Saturday, March 5, 2022
Character Town Hall #1
Time: 1:00 to 3:00 pm
Join Zoom Meeting:
https://us02web.zoom.us/j/82340986724?pwd=SXdyVmVzeEZOTHk4N0xTT3JxT05PZz09
Meeting ID: 823 4098 6724
Passcode: 104647
Join meeting by telephone:
+1 778 907 2071 Canada
Meeting ID: 823 4098 6724
Wednesday, March 16, 2022
Final Town Hall
Time: 6:00 to 8:00 pm
Join Zoom Meeting:
https://us02web.zoom.us/j/81065799325?pwd=Z0RPUlREL21oaHdrV2h6NXNlVVBuUT09
Meeting ID: 810 6579 9325
Passcode: 092960
Join meeting by telephone:
+1 778 907 2071 Canada
Meeting ID: 810 6579 9325
- The Kick-Off Town Hall will be a refresh and review of work completed to date.
Timeline
-
Background
Electoral Area F Official Community Plan Update has finished this stageAugust - December 2019
Terms of Reference and Engagement Plan endorsed
Contact First Nations and key stakeholders
-
Community Engagement Round 1
Electoral Area F Official Community Plan Update has finished this stageJanuary - March 2020
Community Values, Challenges and Opportunities
-
Community Engagement Round 2
Electoral Area F Official Community Plan Update has finished this stageFebruary to March 2022
Community Values, Policy Options and Virtual Town Halls
-
Creating the Draft Official Community Plan
Electoral Area F Official Community Plan Update has finished this stageWriting the Draft Official Community Plan
-
Community Engagement Round 3
Electoral Area F Official Community Plan Update has finished this stageJune - September 2023
The Draft Official Community Plan is available for community review and comment
-
Summarizing Round 3 of Engagement
Electoral Area F Official Community Plan Update is currently at this stageCommunity feedback received during Round 3 of engagement will be used to make changes to the Draft OCP prior to commencing the legislative adoption process.
-
Bylaw Adoption
this is an upcoming stage for Electoral Area F Official Community Plan UpdateCommencement of legislative process including referrals and a public hearing
Document Library
-
Draft Electoral Area F OCP
- Draft Electoral Area F Official Community Plan_June2023.pdf (50.1 MB) (pdf)
- Table of Contents.pdf (142 KB) (pdf)
- Section 1_Introduction and Foundations.pdf (1.17 MB) (pdf)
- Section 1.5_Community Values.pdf (186 KB) (pdf)
- Section 2_Growth Management Framework.pdf (952 KB) (pdf)
- Section 3_Strengthening Community Character.pdf (572 KB) (pdf)
- Section 4_Protecting the Natural Environment.pdf (809 KB) (pdf)
- Section 5_Managing Natural Resources.pdf (811 KB) (pdf)
- Section 6_Building Rural Resilience.pdf (519 KB) (pdf)
- Section 7_First Nations Reconciliation.pdf (695 KB) (pdf)
- Section 8_Implementation.pdf (674 KB) (pdf)
- Section 9_Development Permit Areas.pdf (765 KB) (pdf)
- Appendix A_Glossary of Terms.pdf (490 KB) (pdf)
- Appendix B_Maps.pdf (44.4 MB) (pdf)
-
Draft Electoral Area F OCP Maps
- DRAFT_Map1_PlanArea.pdf (451 KB) (pdf)
- DRAFT_Map2_LanduseDesignations.pdf (2.76 MB) (pdf)
- DRAFT_Map3_EnvironmentalFeatures.pdf (5.74 MB) (pdf)
- DRAFT_Map4_AquiferDemand.pdf (6.85 MB) (pdf)
- DRAFT_Map5_AquiferVulnerability.pdf (7.32 MB) (pdf)
- DRAFT_Map6_CommunityResources.pdf (3.34 MB) (pdf)
- DRAFT_Map7_RoadNetworkExtractResWtrSystems.pdf (2.82 MB) (pdf)
- DRAFT_Map8_GrowthContainBoundaries.pdf (2.94 MB) (pdf)
- DRAFT_Map9_EnvironFreshwaterFishDPAs.pdf (11.5 MB) (pdf)
- DRAFT_Map10_AquiferProtectionDPA.pdf (6.24 MB) (pdf)
- DRAFT_Map11_HazardLandsDPA.pdf (28 MB) (pdf)
-
Draft Development Permit Area Exemptions and Guidelines
- Aquifer Protection Development Permit Area Exemptions and Guidelines.pdf (195 KB) (pdf)
- Environmental Protection Development Permit Area Exemptions and Guidelines.pdf (201 KB) (pdf)
- Freshwater and Fish Habitat Development Permit Area Exemptions and Guidelines.pdf (408 KB) (pdf)
- Hazard Lands Development Permit Area Exemptions and Guidelines.pdf (175 KB) (pdf)
- Community Resources
- Engagement Summaries
Videos
Follow Project
Who's listening
-
Email planning@rdn.bc.ca